Property Search II
stock of the real estate search (February-July 2008): Researched
Land: 150
owner data requested: 112
Definitely not to have: 59
may have
(some still no reply, partly not yet written, partly no contact): 51
have to (immediately or in the course of the year): 5
No owner data requested: 39
land on the open market:
Interesting advertised land / no buyers: 15
Tuesday, June 24, 2008
Friday, June 20, 2008
Benefit Of Radiation Therapy After Whipple Sugery
development unit
Since February 2007, we are intensively looking for land for an assembly.
We have made several attempts to form a foundation with the prospective group ... Today I have understood, the founding group is not a static quantity but a Development unit, which is strongly moving. People are going to recommend the group, bringing themselves, they form influence, but also the group that although they are not always present or long gone. to
I look forward to the debate and hope soon to an object (property) have to make me in this exploration of the familiar can bring me means: with models, plans, diagrams, photographs, drawings, etc. Now
bombing I group with properties that are to be viewed. Soon I will be bombarded with more requests and wishes and also to make change requests!
Since February 2007, we are intensively looking for land for an assembly.
We have made several attempts to form a foundation with the prospective group ... Today I have understood, the founding group is not a static quantity but a Development unit, which is strongly moving. People are going to recommend the group, bringing themselves, they form influence, but also the group that although they are not always present or long gone. to
I look forward to the debate and hope soon to an object (property) have to make me in this exploration of the familiar can bring me means: with models, plans, diagrams, photographs, drawings, etc. Now
bombing I group with properties that are to be viewed. Soon I will be bombarded with more requests and wishes and also to make change requests!
Wednesday, June 18, 2008
Where Can I Watch Angel Blade
home remodeling and repair in Berlin-Kreuzberg, (Phase 1-6)
Concept
The plan should be amended so that a third room may arise.
All installations (gas, heating, plumbing, ventilation, and electrical installation) should be completely renewed.
The new kitchen and bathroom form a core, whereby the courtyard creates a third room. The bathroom is inside, the kitchen is at the same time the passage to the third room. The third room is narrow and long. It can be understood in a kitchen or a working, and children are used as a guest room as an extension of the kitchen.
This core as a new element stands out in color and material of the stock. It is an object with an outer and an Inside different materials and colors will be handled. All "new" interventions, even wardrobes or the cloakroom-
be in the corridor get a signal color.
The surfaces of the old buildings are, where possible, repaired reserved: sanded floors, walls and ceilings and gemalert, stucco cleaned, sanded and painted doors. The two rooms facing the street should be connected by a double door.
the corridor region, two units are to be provided, the act of space.
plan inventory
layout design
wall display
Concept
The plan should be amended so that a third room may arise.
All installations (gas, heating, plumbing, ventilation, and electrical installation) should be completely renewed.
The new kitchen and bathroom form a core, whereby the courtyard creates a third room. The bathroom is inside, the kitchen is at the same time the passage to the third room. The third room is narrow and long. It can be understood in a kitchen or a working, and children are used as a guest room as an extension of the kitchen.
This core as a new element stands out in color and material of the stock. It is an object with an outer and an Inside different materials and colors will be handled. All "new" interventions, even wardrobes or the cloakroom-
be in the corridor get a signal color.
The surfaces of the old buildings are, where possible, repaired reserved: sanded floors, walls and ceilings and gemalert, stucco cleaned, sanded and painted doors. The two rooms facing the street should be connected by a double door.
the corridor region, two units are to be provided, the act of space.
plan inventory
layout design
wall display
Lower Level Isee Test Scores Good
house Prado, and new building in Montevideo (Phase 1-2)
location
On the long and narrow site was in a ruined house and overgrown garden. What was needed was a house with garden for a small family.
Based on the given ground plan with external development (a traditional typology of the early days) and worth preserving garden we have designed a house which will include the one hand, carefully integrated into the design, on the other hand, the starting point of a decidedly contemporary reinterpretation makes.
fire wall between house and provides a break ("Tajo") for better ventilation and lighting of homes on the front. This measure creates a small courtyard at the side of the wall and opened fire at the same time a way to the top where there is the roof terrace with swimming pool. The garden the house is transparent, opening up runs in the area of the old building along the inside space of the garden and jump in the back area where the private rooms are oriented to the garden, on the side of the fire wall.
plans
section
location
On the long and narrow site was in a ruined house and overgrown garden. What was needed was a house with garden for a small family.
Based on the given ground plan with external development (a traditional typology of the early days) and worth preserving garden we have designed a house which will include the one hand, carefully integrated into the design, on the other hand, the starting point of a decidedly contemporary reinterpretation makes.
fire wall between house and provides a break ("Tajo") for better ventilation and lighting of homes on the front. This measure creates a small courtyard at the side of the wall and opened fire at the same time a way to the top where there is the roof terrace with swimming pool. The garden the house is transparent, opening up runs in the area of the old building along the inside space of the garden and jump in the back area where the private rooms are oriented to the garden, on the side of the fire wall.
plans
section
Tvcenter .net Framework
Café Karvana, Berlin-Friedrichshain (Phase 1-4)
were planned renovation and repair of a shop into a café. Location: Gabriel-Max-Str.4, Near Boxhagener Platz, Berlin-Friedrichshain. It was made very small construction projects, the design should behave "minimally invasive" to the stock. The floor was a cement seal, the walls a coat of paint. Only in the plumbing and walls were pulled agebrochen new walls. Main component of this work was in addition to a programmatic study and the determination of the spatial surfaces of the draft of the complete furniture: tables, stools, bench with back-lit wall panels, counters and cabinets, shelving area for the issue of retail products. All Furniture were from film coated plywood panels produced at low cost. The color design envisaged the use of sound sequences between brown and beige, and yellow as an accent color.
plan
Some furniture for ... B.
bench with wall panel
stool
shelf 1
shelf 2
Basin / sanitation
images
were planned renovation and repair of a shop into a café. Location: Gabriel-Max-Str.4, Near Boxhagener Platz, Berlin-Friedrichshain. It was made very small construction projects, the design should behave "minimally invasive" to the stock. The floor was a cement seal, the walls a coat of paint. Only in the plumbing and walls were pulled agebrochen new walls. Main component of this work was in addition to a programmatic study and the determination of the spatial surfaces of the draft of the complete furniture: tables, stools, bench with back-lit wall panels, counters and cabinets, shelving area for the issue of retail products. All Furniture were from film coated plywood panels produced at low cost. The color design envisaged the use of sound sequences between brown and beige, and yellow as an accent color.
plan
Some furniture for ... B.
bench with wall panel
stool
shelf 1
shelf 2
Basin / sanitation
images
Braziliantan Lines Ictures
house on Werbellinsee Weber, (Phase 1-3)
location
Each house forms a cover to protect the environment and is also part of our perception of the exterior. This is all the more for a house in the woods.
concept
The forest is a place of light, changing the daily routine at all times. The casing is to form a frame, the "issued" the landscape.
The shell may be closed down if the house is uninhabited for many months.
The organization of the building in plan provides a large living room in front as a central location, two bedrooms and a small kitchen. All rooms are on the same plane. Be determined by the arrangement of the rooms inside
Kernlemente. They integrate carrying and supply functions and largely define a spatial sequence that can be read as a continuum.
The core elements of the one part I enable the reduction of Möbilierungsaufwands, on the other hand, a consistent and coordinated design of the interiors. Your position also determines the position of final elements, be they doors or sliding doors
to be worked out in detail.
Around the pavilion is like organized provided a terrace house as a wood deck. In addition, part of the roof is designed as a roof terrace, such as for breakfast overlooking the lake, sunbathing or as a place for reading.
plan
section
model
perspectives / views
A wooden facade is proposed in between is pure opening (windows that are open), fixed glazing with siping (skylights) and closed areas (wall space) differed.
provides a system of sliding elements for the necessary of locking in the period in which the house remains unoccupied.
internal perspective
location
Each house forms a cover to protect the environment and is also part of our perception of the exterior. This is all the more for a house in the woods.
concept
The forest is a place of light, changing the daily routine at all times. The casing is to form a frame, the "issued" the landscape.
The shell may be closed down if the house is uninhabited for many months.
The organization of the building in plan provides a large living room in front as a central location, two bedrooms and a small kitchen. All rooms are on the same plane. Be determined by the arrangement of the rooms inside
Kernlemente. They integrate carrying and supply functions and largely define a spatial sequence that can be read as a continuum.
The core elements of the one part I enable the reduction of Möbilierungsaufwands, on the other hand, a consistent and coordinated design of the interiors. Your position also determines the position of final elements, be they doors or sliding doors
to be worked out in detail.
Around the pavilion is like organized provided a terrace house as a wood deck. In addition, part of the roof is designed as a roof terrace, such as for breakfast overlooking the lake, sunbathing or as a place for reading.
plan
section
model
perspectives / views
A wooden facade is proposed in between is pure opening (windows that are open), fixed glazing with siping (skylights) and closed areas (wall space) differed.
provides a system of sliding elements for the necessary of locking in the period in which the house remains unoccupied.
internal perspective
Restasis Eye Drops In Canada
remodeling, repair and conversion of a former day care center in Berlin-Mitte, (Phase 1-3)
floor plans inventory
studies for the transformation and conversion a vacant former day care center in the line in Berlin-Mitte. Were provided two units (ground floor and 1st floor) and a commercial unit in the CB.
plan ground floor
plan first Floor
floor plans inventory
studies for the transformation and conversion a vacant former day care center in the line in Berlin-Mitte. Were provided two units (ground floor and 1st floor) and a commercial unit in the CB.
plan ground floor
plan first Floor
Cost To Reupholster A Boat Seat
competition history of the Essen Haus
(in association with Sybille Sawall and Bernd Bronnert)
libraries, archives and storage building buildings are subject to substantial change, which is Wachstuausgelöst by her steady. We therefore propose a three-step scenario, in the center of a growth model is that the requirements
the growing space needs with a modular concept Archives fulfilled.
The aboveground volume of the City Archives is in the amount and scale adjusted to the level of the old building to find in the building complex of Luis school entrance. Its position is within the property boundaries without lateral connections to existing structures. With regard to the objectives of sustainability derBaukörper is divided into two elements, which introduces a new logic of extensibility on the property, the concrete slabs as a horizontal link and the magazine capacity as a vertical element. The base is formed as a transparent area that allows the ground floor of an insight into the archive world. Above the base the magazine as abstract, is staged in a mysterious way of completed buildings. By the urban positioning on the track field facade is visible from afar: in particular, from the direction of Essen-center and from the
tracks from the house as a memory of the city will soon be a puzzle, combine to soon as a call or call a supplier of subtle messages in memory.
forgetting and remembering are addressed as important cultural and historical processes in the facade design. The facade itself to the archive. The inside stored documents are composed of different characters, as a reminder to be fonts of different times on the facade, exposed the way the
osziliert presentation of the font between the poles of remembering and forgetting.
Urban Location
stages
South-West
second floor plan Floor
Diverse views
Hofanischt
(in association with Sybille Sawall and Bernd Bronnert)
libraries, archives and storage building buildings are subject to substantial change, which is Wachstuausgelöst by her steady. We therefore propose a three-step scenario, in the center of a growth model is that the requirements
the growing space needs with a modular concept Archives fulfilled.
The aboveground volume of the City Archives is in the amount and scale adjusted to the level of the old building to find in the building complex of Luis school entrance. Its position is within the property boundaries without lateral connections to existing structures. With regard to the objectives of sustainability derBaukörper is divided into two elements, which introduces a new logic of extensibility on the property, the concrete slabs as a horizontal link and the magazine capacity as a vertical element. The base is formed as a transparent area that allows the ground floor of an insight into the archive world. Above the base the magazine as abstract, is staged in a mysterious way of completed buildings. By the urban positioning on the track field facade is visible from afar: in particular, from the direction of Essen-center and from the
tracks from the house as a memory of the city will soon be a puzzle, combine to soon as a call or call a supplier of subtle messages in memory.
forgetting and remembering are addressed as important cultural and historical processes in the facade design. The facade itself to the archive. The inside stored documents are composed of different characters, as a reminder to be fonts of different times on the facade, exposed the way the
osziliert presentation of the font between the poles of remembering and forgetting.
Urban Location
stages
South-West
second floor plan Floor
Diverse views
Hofanischt
Subscribe to:
Posts (Atom)